loading
Design
Basement
Stack car parking
First Floor
Restaurant
Second Floor
Provision for food court & recreational spaces
Ground Floor
Grand double-height entrance lobby
Recreational space with coffee lounge
Concierge and reception area
Italian marble flooring and dado in common areas
3 to 28 Floors
Office spaces - Warm shell condition
12 super high-speed elevators with a capacity of 24 passengers each
2 high-speed service elevators
Spacious washrooms with designer fittings
Equipped with Intelligent Building Management Systems (IBMS)
Air Handling Units (AHU) provided


Sales Area Options
4-Office Floors
Office 01 - 6,122 sq.ft.
Office 02 - 8,024 sq.ft.
Office 03 - 8,665 sq.ft.
Office 04 - 6,023 sq.ft.
2-Office Floors
Office 01 - 14,684 sq.ft.
Office 02 - 14,884 sq.ft.


Retail Space
Ground Floor
Retail - 3,332 sq.ft.
Business Centre - 2,867 sq.ft.
First Floor
Gymnasium - 6,300 sq.ft.
Restaurant - 5,947 sq.ft.
Second Floor
Food Court - 29,183 sq.ft.


Refuge Space - 3 Office Floors
5th Floor
Office 01 - 6,013 sq.ft.
Office 02 - 8,030 sq.ft.
Office 03 - 10,295 sq.ft.
9th Floor
Office 02 - 10,184 sq.ft.
Office 03 - 8,507 sq.ft.
Office 04 - 6,142 sq.ft.
13th Floor
Office 01 - 6,025 sq.ft.
Office 02 - 8,488 sq.ft.
Office 03 - 10,325 sq.ft.


Refuge Space - 2 Office Floors
17th & 25th Floor
Office 01 - 10,184 sq.ft.
Office 02 - 14,739 sq.ft.
21st Floor
Office 01 - 14,644 sq.ft.
Office 02 - 10,328 sq.ft.


Building Specifications
Earthquake Zoning
As per BIS, having importance factor of 1.5
Facade
70% Glazed + 30% ACP Cladding
Elevators
Super high-speed elevators
12 passenger elevators
2 service elevators
HVAC
Based on chilled water supply from a central cooling unit up to heat exchanger. The distribution is up to AHU rooms on respective floors
Electrical
Connection point provided in the service lobby at the Electrical Room
Energy meter provided at every floor near respective office blocks
Power backup for emergency lighting and services provided for the common areas
PHE
Public Health Engineering (water, sanitation, etc.) facilities provided as per norms servicing the common utilities at every floor
FPS
Fire Protection System provided as per norms. Sprinkler system provided for common areas. Tap-off point for tenant office areas provided
Solid Waste
Vertical chutes on each floor
Toilet Blocks
Toilet block on every floor provided as per the NBC norms including finishing and fittings